DUB12 Data Centre

MDE Installations were appointed to complete the full busbar installation at DUB12 Data Centre project in Dublin. MDE coordinated the pre-installation support, as well as completed full installation and commissioning.

The use of busbar over cable and tray has become the industry standard because of flexibility, future proofing and reduced installation time. The added benefit of bar over cable is that maintenance costs are dramatically reduced.

Challenges & Complexities

  • Precision and Accuracy
  • Integration with other trades
  • Space Constraints
  • Safety Compliance
  • Logistical Challenges