Project Overview
MDE has been appointed as the Electrical Specialist Sub-Contractor for the electrical services installations in the Clondalkin Schools project. This development includes the construction of two new 16-classroom primary schools, Gaelscoil na Camóige and Gaelscoil Cluain Dolcain, as well as a new PE hall for Coláiste Chillian.
The project also involves the creation of two new access routes: one on New Nangor Road and another at the junction of Old Nangor Road and New Nangor Road. A new vehicle entrance and exit will be established on Old Nangor Road to facilitate a one-way traffic system for school drop-off and collection. During the construction, Coláiste Chillian (Secondary School) will remain operational, and Gaelscoil Cluain Dolcain, which currently occupies part of the secondary school building, will relocate upon completion of the new school. The contract also includes modifications to this secondary school space once the primary school buildings are finished.
Scope of Works
MDE’s scope of work for the Clondalkin Schools project includes a full range of electrical installations:
- Cable Installation – Complete installation of electrical cabling to support the infrastructure.
- Containment Installation – Implementation of containment systems for electrical wiring.
- Switchgear Installation – Installation of switchgear for power distribution.
- Lighting Installation – Full installation of internal and external lighting systems.
- Emergency Lighting – Ensuring safe evacuation routes with emergency lighting solutions.
- Public Address Systems – Installation of PA systems for communication and emergency announcements.
- Data Installation – Implementation of IT infrastructure and data cabling.
- Intruder Alarm Systems – Integration of intruder detection systems for enhanced security.
- Access Control – Installation of access control systems to manage entry and exit.
- CCTV Installation – Deployment of surveillance systems for school security.
- Disabled Refuge Systems – Installation of emergency communication points for accessibility.
- Fire Alarm Installation – Design and installation of fire alarm systems for maximum safety.
- Lighting Controls Installation – Implementation of advanced lighting control solutions.
- Lightning Protection Installation – Ensuring the buildings are protected from lightning strikes.
- General Accessories – Installation of essential electrical fixtures and fittings.
- Data Trunking – Provision of data trunking to support IT and communication systems.
Key Project Features
- Phased Construction: The project will be completed in three phases to minimise disruption to the existing school operations.
- Traffic Management: A new vehicle entrance and exit on Old Nangor Road will enable a one-way traffic system, improving safety and efficiency during drop-off and collection.
- Sustainability & Safety: The project incorporates modern electrical and safety systems to create a secure, energy-efficient learning environment.
- Educational Enhancement: The new classrooms and PE hall will provide state-of-the-art facilities for students and staff.
Project Timeline
The project is scheduled to be completed over a 15-month period. MDE is committed to delivering high-quality electrical installations that meet the project’s rigorous safety, efficiency, and sustainability standards.
Project Impact
The Clondalkin Schools project is a significant investment in local education, providing modern, well-equipped learning spaces for both primary and secondary students. MDE is proud to contribute to the development of these essential facilities, ensuring a safe, innovative, and future-ready environment for generations to come.