Our Lady of Lourdes Hospital, Navan

Key Information

Location Navan

Client HSE Dublin East Region

Consultant FCC Fire Cert Ltd

Overall Project Value €300,000

About This Project

Navan Hospital provides a general acute hospital service to the local HSE catchment area. The main two-storey building is a detached seventeen-bay former workhouse, built-in 1840.

MDE successfully completed the full energy efficiency upgrade works. This very rewarding and challenging assignment combined the demands of updating and refurbishing to current standards with achieving energy efficiency in a complex heritage building.

During the project, we were within a live hospital working environment with infection control requirements. As Principal Contractor we were able to demonstrate our skills and expertise in working in a heritage building environment with all the technical challenges that that presents.

Project Challenges at a Glance

  • Listed building
  • Protection to an existing structure
  • Infection Control