MD Electrical Installations successfully completed the upgrade of existing main switchboards 1 & 2 and the replacement of existing main maintained switchboard within the basement of the Tower Block at Belfast City Hospital (BCH).  This was a complex project which required precision management of the ‘electrical shutdowns’ and switch over to 4 main generator backups were crucial in the effective and efficient delivery of the electrical upgrade.

The contract comprised of the following range of general and specialist activities and they are as follows:

  • Disconnection and Removal of Existing Main Maintained Switchboard.
  • Installation of New Form 4 Type 6 Main Maintained Switchboard.
  • Modifications to Main Switchboard 1 and 2.
  • Installation of New Remote Generator Connection Boxes.
  • Hire of Mobile Generators.
  • Testing & Commissioning.
  • Upgrade of existing main switchboards 1 & 2.
  • Replacement of existing main maintained switchboard within basement.
  • Installation of LV mains cabling in kitchen.
  • Associated builders work in connection.
Project Client
Belfast City Hospital
Project Duration
Ongoing
Project Consultant
Taylor & Fegan
Project Role
Principal Contractor

Other projects in Health

latest news

contact us

12 Killycurragh Road
Omagh, Co. Tyrone
BT79 0JD

Telephone: 02880 771 322
Facsmile: 02880 771045
Email: info@mdeinstallations.com

newsletter sign-up

Slideshow Image 1 Slideshow Image 2 Slideshow Image 3 Slideshow Image 4 Slideshow Image 5 Slideshow Image 5 Slideshow Image 5 Slideshow Image 5